Regulation
Cyber Resilience Act enters into force
Regulation (EU) 2024/2847 was published in the Official Journal on 20 November 2024 and entered into force twenty days later. No obligations applied yet: this date started the transition period.
RessourcenKostenlos, ohne RegistrierungAuf Englisch
The dates on which the Cyber Resilience Act starts to bind manufacturers, with suggested preparation targets in between. Add them to your own calendar in one click.
Next binding deadline
· Articles 64(2), 69(2) and 71(2)
379days
13hours
11minutes
Regulation
Regulation (EU) 2024/2847 was published in the Official Journal on 20 November 2024 and entered into force twenty days later. No obligations applied yet: this date started the transition period.
Regulation
Chapter IV (Articles 35 to 51) on the notification of conformity assessment bodies applies from this date, so Member States can designate the notified bodies that carry out third-party conformity assessments.
Reporting Binding deadline
Article 14 applies from this date. Manufacturers must notify actively exploited vulnerabilities and severe incidents: an early warning within 24 hours, a notification within 72 hours, and a final report within 14 days of a corrective measure being available (vulnerabilities) or within one month of the notification (incidents). This also covers products placed on the market before 11 December 2027.
Suggested target
Not a legal deadline. The vulnerability handling requirements ask for a software bill of materials in a machine-readable format covering at least the top-level dependencies. Producing it for every release nine months ahead leaves time to act on what it reveals.
Suggested target
Not a legal deadline. The risk assessment decides which essential requirements apply to the product and how they are met, so the rest of the technical documentation depends on it. Six months of margin is a reasonable buffer.
Suggested target
Not a legal deadline. The technical documentation must exist before a product is placed on the market. Finishing it three months early leaves room for the conformity assessment and the EU declaration of conformity.
Regulation Binding deadline
All remaining obligations apply to products with digital elements placed on the EU market from this date: the essential requirements of Annex I, conformity assessment, technical documentation, the EU declaration of conformity and CE marking. Breaches of the essential requirements or of Articles 13 and 14 can be fined up to EUR 15 000 000 or 2.5 % of worldwide annual turnover, whichever is higher. Products already on the market are covered only if substantially modified afterwards.
Heute · · 380 Tage, bis der CRA vollständig gilt
Beginnen Sie mit einer Produktfamilie. Ihre EN-18031-Tabellen fließen in die CRA-Akte ein.
Fordern Sie eine Demo und ein Preisangebot für Ihre Produkte an.
Mehr erfahren:RED-Cybersicherheit (EN 18031)Cyber Resilience Act
Wir verwenden Cookies und ähnliche Tools, damit diese Seite funktioniert, um die Nutzung zu messen und (mit Ihrer Erlaubnis) Sitzungen für Produktforschung aufzuzeichnen. Sie können Ihre Wahl jederzeit über „Cookie-Einstellungen“ im Footer ändern. Cookie-Richtlinie lesen